The hospital was looking to replace operating room AHU with little downtime.
Solution
⦁ Flex Air developed AHU custom shipping splits. ⦁ Custom down length of AHU so install could be moved via freight elevators. ⦁ Complete assembly (did not have to build on-site) within 24 hours from demo to new install.