Our Projects

Saint Joseph Mercy Health System

Description

  • New tower
  • (5) custom AHUs
  • Custom rooftops with architectural siding
  • Factory fabricated pipe trains
  • (3) 300 ton air cooled chillers
  • Operating, isolation room, and pharmacy pressure control system
  • AHU airflow measurement

OEM: Flex Air
Dunham Bush
CRC

Project

Saint Joseph Mercy Health System

Category

Hospital

Location

Brighton, MI

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


KCAP Substation

Miller

Description

10,000 KVA (5.6 MW) Substation consisting of three substations plus a sparing substation.

Challenge

This substation had to be completed quickly and efficiently. An off-site manufacturing solution was decided upon in order to decrease project timelines.

Solution

⦁ Flex Air completed this project Off-site while helping with the installation process on an accelerated project timeline.
⦁ The substation consists of low and medium voltage transformers, Switch gear and factory installed tiebuss.
⦁ In-house design (PE)

Project

KCAP Substation

Category

Modular Electric

Client

Ford

Location

Kansas City, MO

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


Ford Mobile Charging Station

Description

480V battery charger substation.

Challenge

To construct a substation modular system to work around the other demo and construction going on in the location.

Solution

⦁ Design and engineered a 2-section enclosure for rapid deployment.
⦁ All level 1 and 2 commissions were done in the manufacturing facility prior to shipping.
⦁ Weight 115,000 lbs.

Project

Ford Mobile Charging Station

Category

Modular Electric

Client

Ford

Location

Mobile – Dearborn, MI

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


GM Yuma

GM Yuma

Description

Battery Charging Sub Station.

Challenge

Complete the substation 4 weeks after gear arrival. The electrical equipment was delayed in manufacturing by the gear manufacturer, and the general contractor needed to turn the project over to GM within 6 weeks of receiving gear.

Solution

⦁ Flex Air designed and engineered a modular enclosure for the gear.
⦁ The enclosure was ready on the manufacturing floor when the gear arrived.
⦁ Shipped a “turnkey” unit within 4 weeks of receiving gear.

Project

GM Yuma

Category

Modular Electric

Client

GM Yuma

Location

GM Proving Grounds – Yuma, Arizona

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


Ford Boiler

Ford Boiler

Description

300 Horsepower steam boiler plant for automotive manufacturer application.

Challenge

The company needed a vendor to expedite delivery and install of a new boiler plant to replace the aging infrastructure. The entire project timeline was accelerated.

Solution

⦁ Flex Air was contracted to finish/complete the design of the steam plant and source boilers.
⦁ Support installation within an accelerated project timeline.
⦁ Supply (2) 150 HP steam boilers.
⦁ Complete with feed water tank and steam manifolds.

Project

Ford Boiler

 

Category

Modular Mechanical

Client

Ford

Location

Windsor, Canada

Social Links

Completely synergize resource taxing.

  •  
  •  
  •  
  •  

Have a
project in
mind?


Let’s Talk


GM Ultium

GM Ultium

Description

Medium Voltage Switch House.

Challenge

Construction Schedule Constraints.

Solution

⦁ Flex Air designed and built a modular switch house to go in place of the standard pre-engineered building.
⦁ Deployed a 4,956 sq. – 14 section modular building containing 3 medium voltage gear line ups.
⦁ Completed with tie buss, cable buss (for field connection), battery room, and HVAC solution.
⦁ Delivered a “turnkey” solution and saved 16 weeks on the job site construction schedule.

Project

GM Ultium

Category

Modular Electric

Client

GM

Location

GM – Lordstown, Ohio

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


UD Worrilow

UD Worrilow

Description

Two (2) 30,000 CFM AHU with thermal break construction.

Challenge

Aggressive lead time with high-end performance. A design challenge for high-end laboratory-type applications.

Solution

⦁ Worked within design constraints.
⦁ Flex Air manufactured unit to prevent exterior condensation.
⦁ Delivering tight tolerance on humidity and filtration/air quality.
⦁ Including energy recovery.

Project

UD Worrilow

Category

AHU

Client

UD

Location

University of Delaware

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


IPS Sofie

IPS-Sofie

Description

A 2700 sqft. custom mechanical platform and penthouse with an integrated chilled water system, hot water system, compressed air, steam, general and lab air handlers.

Challenge

Integrate all systems (mechanical) with limited interference to the building.

Solution

⦁ Fully integrated.
⦁ Complete offsite build which allowed for reduced onsite labor and a shorter project schedule.
⦁ Utilized all 3 Mi Divisions: Performance Fabrication, Flex Air design and engineered Mechanical and Electrical skids, and MIR sourced lab equipment.

Project

IPS Sofie

Category

AHU

Client

IPS

Location

Totowa, New Jersey

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


GE Aerospace

GE Aerospace

Description

Package custom AHU with integrated desiccant de-humification.

Solution

⦁ One (1) 18,000 CFM, HVAC unit for paint process application with integrated desiccant dehumidification.
⦁ AHU and vestibule all in one.
⦁ All mechanical and electrical was pre-piped and wired for a turnkey mechanical solution.

Project

GE Aerospace

Category

Modular Electric

Client

GE Aerospace

Location

Mishawaka, New York

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


Ford MAP

Ford MAP

Description

13Kva double-ended substation.

Challenge

Cost and speed to deployment, and site constraints.

Solution

⦁ Designed and engineered a modular substation
⦁ Installed standard cable tray for wiring of all skid-mounted equipment (equipment provided by the client, assembled in the Flex Air plant)

Project

Ford MAP

Category

Modular Electric

Client

Ford

Location

Michigan Assembly Plant – Wayne, MI

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


GM Ramos

Ramos-featured

Description

Large scale manufacturing facility with over 2,200,000 CFM deployed across 42 custom outdoor, direct-fired heating, and chilled water cooling units. All the power, controls, and piping were complete for single-point connection by the installing contractor.

Solution

⦁ An engineered common solution to simplify production to meet the project schedule.
⦁ Worked with preferred control contractor to deliver on customer specifications.
⦁ Turnkey AHU with all piping and electrical completed in the factory to reduce field cost and project schedule.

Project

GM Ramos

Category

AHU

Client

GM

Location

Ramos, Mexico

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


WVU Ruby

WVU Ruby

Description

A 30,000 CFM hospital-grade, rooftop AHU.

Challenge

The hospital was looking to replace operating room AHU with little downtime.

Solution

⦁ Flex Air developed AHU custom shipping splits.
⦁ Custom down length of AHU so install could be moved via freight elevators.
⦁ Complete assembly (did not have to build on-site) within 24 hours from demo to new install.

Project

WVU Ruby

Category

AHU

Client

West Virginia University (WVU)

Location

West Virginia University

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


Allegheny Health

Allegheny Health

Description

A 42,500 CFM hospital-grade AHU matching the architectural building siding.

Challenge

Design and Build a custom AHU for exterior design to blend with the existing building.

Solution

⦁ Standard construct design allowed for any number of architect siding to be factory mounted with minimal cost or lead time impact.
⦁ Custom siding created to blend with the existing building.

Project

Allegheny Health

Category

AHU

Client

Allegheny Health

Location

Jefferson Hills, PA

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk


FCA WS/WL MACK

FCA WS/WL MACK

Description

A total of 3.3 Million CFM – (53) AHU for a large-scale new paint shop building. Designing efficient and effective filtering and conditioning for paint process.

Challenge

Size and scope of the project with an aggressive project schedule.

Solution

⦁ Design and deliver AHU for the first large-scale paint shop.
⦁ Worked closely with paint shop engineering team to make sure that design was approved to meet the job site schedule.
⦁ Developed filtering, conditioning, and humidification for an ideal paint shop process.

Project

FCA WS/WL MACK

Category

AHU

Client

FCA

Location

Detroit

Social Links

Completely synergize resource taxing.

Have a
project in
mind?


Let’s Talk