To construct a substation modular system to work around the other demo and construction going on in the location.
Solution
⦁ Design and engineered a 2-section enclosure for rapid deployment. ⦁ All level 1 and 2 commissions were done in the manufacturing facility prior to shipping. ⦁ Weight 115,000 lbs.