A project with a modular solution presents an average of 25% cost savings and a timeline that is completed up to 40% faster than a standard stick build project. This solution shifts labor off-site to avoid inflated labor costs and leaves the factory as a complete shipping system to then be re-assembled and re-wired on site by Flex Air.